Sunday, August 29, 2010

Squint Shot 082910

The last three days we have looked at various portions of the front stairway in the State Farm offices (house) on East Grand River. Katie Pikkaranin and I finally made it upstairs. The second floor is basically unfinished at this point -- or should I say, stripped of its former self. Bare studs, wire, wood floors, unplastered walls, and brickwork are all visible as they consider what to do next with this area. The studs and brickwork were of interest to me as with the crude cut marks in the wood and the uneven plaster.

No comments: