Thursday, April 8, 2010
Squint Shot 040810
A few more indoor shots of the two buildings at the southeast corner of the main four and then there will be a few close-ups of the outside detail. As these buildings were being worked on, the ceiling materials that covered these beams was rotting, falling from the ceiling, and not worth saving. When all of the materials were stripped and the nails pulled out, the effect of the large beams and underside of the wood floor above gave a new and different look to the inside of the room. It was cleaned up, sanded, and painted. If you have a chance to be in this store, be sure to look up.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment